News Center
Shandong Longtai Group is a professional R&D and manufacturing enterprise of barrier and explosion-proof skid-mounted gas stations, methanol fuel skid-mounted gas stations and special containers. It is a well-known enterprise of skid-mounted gas stations
Conventional Design of LNG Atmospheric Large Tank Process Piping
Time:2021-11-13
Number:1125
The scope of supply of the pipeline connected to the storage tank is the boundary after the first elbow connected to the bottom of the storage tank and the pipe gallery after exiting the storage tank. The inlet pipe is the first fixed frame before the automatic valve cut. The outlet pipe is the first fixed frame after the automatic valve cut (both include automatic shut-off valve and fixed frame). The seller provides the pressure calculation data of the tank side pipeline of the fixed frame (including axial and radial loads), and the seller is responsible for the scope of supply For stress compensation, the seller provides the civil construction conditions of the pipe frame in the scope of supply, and the pressure calculation data of the fixed frame tank side pipeline (including axial and radial loads). The seller is responsible for the stress compensation of the pipeline in the scope of supply; the interface with the design is in the imported emergency shut-off valve Before and after the exit emergency shut-off valve.

    And consider the pipeline stress within its scope; the inlet and outlet of the storage tank should be equipped with safety valves, and the self-pressurized vaporizer (the seller provides the equipment installation and civil construction conditions) should also be equipped with safety valves, and all supply pipelines should be kept cold.
Information
Related To Recommend